Joined
·
1,683 Posts
http://www.glamisweather.com/gpwr2.wmv
This is the best info I could find at this time. I got this info from www.Glamisweather.com and Glamisdunes.com
The road is going to be closed 100%. They were installing the post in the washes that were left out. He said they had left them out as long as possible but the rail line has instructed them to close them now. All of this due to the 3 kids killed last year. He said the families are suing the rail line for 37.5 million. So the rail company has no choice other than to close down the road to prevent any future accidents. He said the fence will carry down approx. 8 miles. I asked him if a new road was going to be installed, he said no unless someone from BLM or one of the Glamis organizations does one.
OK the BLM contact, basically said the BLM has no control over the fencing, the rail road is closing the road due to problems that have happened the three kids that got hit by the train. Basically he said there is nothing the BLM can do at this point, but they will be required to enforce the closure. Hopefully a new road can be graded next to the fence eventually. I would imagine with the budget shortfalls that might take some time? Not what I wanted to hear!
This is the best info I could find at this time. I got this info from www.Glamisweather.com and Glamisdunes.com
The road is going to be closed 100%. They were installing the post in the washes that were left out. He said they had left them out as long as possible but the rail line has instructed them to close them now. All of this due to the 3 kids killed last year. He said the families are suing the rail line for 37.5 million. So the rail company has no choice other than to close down the road to prevent any future accidents. He said the fence will carry down approx. 8 miles. I asked him if a new road was going to be installed, he said no unless someone from BLM or one of the Glamis organizations does one.
OK the BLM contact, basically said the BLM has no control over the fencing, the rail road is closing the road due to problems that have happened the three kids that got hit by the train. Basically he said there is nothing the BLM can do at this point, but they will be required to enforce the closure. Hopefully a new road can be graded next to the fence eventually. I would imagine with the budget shortfalls that might take some time? Not what I wanted to hear!